Mechanical &
Plant Engineering
Long project cycles, high capital commitment, breaks between sales, engineering, procurement and finance: in plant engineering, margins are not decided at year-end closing but in costing – and costing is only right if the ERP system, routings and value flows truly reflect the business.
We create transparency down to project and cost-object level and turn figures back into a management tool.
Typical challenges
Costing does not reflect the real business
Overhead rates stem from a cost structure dating back ten years; routings are maintained technically but have never been assessed commercially. The result: quotes that add up on paper and cost real money.
Margins only show after project completion
With a two-year project duration, post-calculation is a post-mortem. Only what is visible during the project can be steered – and that requires a clean cost-object structure that many ERP systems were never given.
The figures do not hold up at account level
Grown charts of accounts, inconsistent posting logic, collective accounts where no one can trace what a balance is made of. Every analysis built on top inherits this lack of precision.
Valuation issues with long project durations
Work in progress, accruals, provisions, partial acceptances: this is exactly where discussions with auditors and banks arise – and exactly where traceable documentation is often missing.
Knowledge sits in people’s heads, not in the system
Only two people in the company really understand costing. If one is absent, the ability to quote comes to a standstill. There are no procedural instructions, no internal control system, no deputy arrangements.
Breaks between sales, engineering, procurement and finance
Every department works properly – the handovers do not. Data is entered several times, reconciliations run via Excel, and at month-end finance clarifies what happened operationally long ago.
How we help
We create transparency first – then we optimise
In the K² Readiness Review we analyse the P&L, balance sheet, account logic and the organisation of accounting. In parallel we assess the end-to-end processes and the level of digitalisation. After just a few weeks you have a reliable picture: where derivation is missing, where errors arise, where the biggest levers lie. With process mining we show how your processes actually run – not how they are documented.
We rebuild costing on a sound business basis
For us, Cost & Value Engineering means setting up the costing model, overhead rates, cost-object structure and routings in the ERP system so that they reflect operational reality – the real value flows and processes in the company. Only then are pre-calculation, pricing and post-calculation reliable, and cost drivers become visible at all.
We make project margins visible during the project
Performance Management: project controlling, forecasting and management reporting on a clean data basis. KPI systems that continuously show project progress, costs and margin – instead of only at the final review.
We secure closing and audit readiness
Accounting Advisory: accounting under German GAAP (HGB), valuation of work in progress, accruals and provisions, clean-up of complex accounts. Plus governance structures – procedural and work instructions, an internal control system, documented posting logic and document flows. The goal is accounting that stands up to auditors, banks and shareholders.
We close the gaps between departments
End-to-end business process optimisation across P2P, O2C and R2R, including the interfaces to engineering and sales. Where automation or AI brings real benefit, we use it – and where it only masks symptoms, we say so.
We stay until it works
Finance Systems & ERP Advisory for system-side implementation, Interim Management for vacancies in key functions, K² Academy for knowledge transfer to your team, Business Process Outsourcing for what you want to hand over permanently. We do not deliver a concept and say goodbye.
How we proceed
Step 1
K² Readiness Review
Analysis of finance structures, costing and end-to-end processes. The result is a clear picture of the situation with prioritised measures.
Step 2
Prioritisation
Assessment of measures by impact and feasibility, together with your departments.
Step 3
Implementation
Realisation in system, process and accounting – with support through to measurable impact.
Typical project outcomes
Real-time project controlling
Live visibility into project progress, costs, and margins
Improved cash flow planning
Accurate forecasts even with long project durations
Automated post-calculations
Fast and precise margin control after project completion
Transparent project costs down to cost object level
Precise cost allocation for each project
Reduced cycle times
Optimized processes between sales, engineering, and finance
Clear end-to-end process transparency
Seamless interfaces between ERP and finance

Your contact
Talk to an expert
Thomas Kirsch
Managing Partner
Companies we work with
Review funding opportunities
Many transformation projects in the mid-market are eligible for funding.
We support you in identifying the right programs.